Building an ADU can be a fantastic investment, offering additional living space or rental income while boosting your property value. Here's what you need to know about the costs associated with building an ADU in 2024.
1. Average Cost of Building an ADU
- Total Cost Range: $60,000–$360,000
- Cost per Square Foot: $150–$300 (or up to $600 for premium finishes).
- Common Sizes and Costs:
| ADU Size (sq. ft.) | Min Cost | Max Cost |
|-------------------------|--------------|--------------|
| 400 sq. ft. | $60,000 | $120,000 |
| 600 sq. ft. | $90,000 | $180,000 |
| 1,200 sq. ft. | $180,000 | $360,000 |
2. Costs by Type of ADU
| Type of ADU | Min Cost | Max Cost | Details |
|-----------------------------|--------------|--------------|-------------|
| Basement Conversion | $60,000 | $150,000 | Utilizes existing structure; lower costs. |
| Garage Conversion | $60,000 | $150,000 | Condition of garage affects price. |
| Attached New Build | $100,000 | $216,000 | Shares wall with main home; moderate cost. |
| Above-Garage New Build | $128,000 | $225,000 | Often requires structural support upgrades. |
| Detached New Build | $110,000 | $285,000 | Standalone; higher cost for utilities and foundation. |
3. Key Cost Factors
Design
- Cost: 10–15% of total project cost.
- Example: $12,000–$18,000 for a $120,000 ADU.
Materials
- Cost: 45–50% of the total project cost.
- Includes framing, roofing, insulation, windows, and doors.
Labor
- Cost: 40% of the total project cost.
- Breakdown:
- Architects: $125–$250/hour.
- Contractors: $300–$500/day.
- Electricians: $50–$100/hour.
- Plumbers: $45–$200/hour.
Foundation
- Cost: $4–$25/sq. ft. ($2,400–$30,000 for 600–1,200 sq. ft.).
Utilities
- Electrical Wiring: $1,000–$2,500.
- HVAC System: $6,000 (furnace and AC).
- Plumbing: $900.
- Solar Panels (if required): $2,500–$3,500.
Finishing
- Cost: $10–$150/sq. ft.
- Includes drywall, paint, flooring, appliances, and fixtures.
4. Additional Costs
| Category | Cost Range | Details |
|----------------------------|----------------------------|-------------|
| Site Prep | $1,000–$5,800 | Land leveling, grading, and clearing. |
| Permits | $1,350 (average) | Varies by location; CA permits cost $10–$12/sq. ft. |
| Post-Construction Cleanup | $0.10–$0.50/sq. ft. | $60–$600 for standard ADUs. |
| Waste Disposal | $100–$600 | Dumpster rental may cost $300–$600/week. |
5. Prefabricated ADUs
- Savings: Up to 20% compared to custom-built ADUs.
- Advantages:
- Faster installation.
- Pre-determined pricing.
- Easier to assemble.
6. DIY vs. Hiring Professionals
DIY Approach
- Savings: $24,000–$144,000 (approx. 40% of labor costs).
- Risks:
- Non-compliance with building codes.
- Errors in construction or safety risks.
- Greater likelihood of costly delays or rework.
Hiring Professionals
- Benefits:
- Expertise ensures compliance with local codes.
- Efficient project management.
- Reduced risks of structural or system issues.
7. Tips to Save on ADU Costs
- Choose a Prefabricated Design: Prefabs save time and money while allowing for customization.
- Select Durable Materials: Invest in materials that reduce long-term maintenance costs.
- Opt for Simpler Finishes: Avoid high-end appliances or custom details unless necessary.
- Bundle Services: Combine site prep, utilities, and framing for cost-effective contracts.
Building an ADU is a significant investment, but with thoughtful planning, you can create a valuable and versatile addition to your property!
Next: Read 2500+ consumer guides to shopping, electronics, appliances, home services, cars, money and more.